Jonas Stein <[email protected]> wrote: > > Yes, but JOSM has a chunked upload mode where it uses multiple > > transactions for one upload. > > Can someone confirm, that josm first uploads an empty node > and then the content?
Can't confirm ; be it would be very strange to upload an empty node, then the tag associate... or an empty node then then way associated. But it coudl happen for ways... > If split uploads contain this emty ones at the moment lets summarise: > > There could be empty nodes during splitted uploads. > So nobody should delete nodes that are younger then a given timespan. The splitted upload has a very short life. I notice that in my area at a moment a create lot to empty nodes (would have been associated with a building) when i try to upload a big changeset (but JOSM failed) so then i use the split upload function from JOSM and never got the same problem. >From those expériences, i could say that big upload with JOSM could lead to dupplicate nodes and empty nodes ; split upload are safer. > ps: uploads should not split within empty nodes, > but thats no topic here for now. It can't be done, there is circompstance that would lead to empty nodes upload. Imagine a large way (more than 300 nodes). If JOSM upload with a split parameter of 200, then it would split during the way+nodes upload and if for any reason the upload stop there empty nodes have been transmit to the server... -- Pierre-Alain Dorange _______________________________________________ talk mailing list [email protected] http://lists.openstreetmap.org/listinfo/talk

