Quick question - just in case someone knows a quick answer:
a) if I want to put in a conditional statement in my workflow, with the
direction of output depending on the result of a test, is that possible?
Which activity type do I use?
b) if I want to put a pause in (e.g. because I know I'll have to wait
five minutes before retrying the conditional test above) is there an
activity for that?
What I'm trying to do here is construct a conditional loop:
Get activity output
Loop While activity output = some predefined constant
Pause (to prevent hammering it)
Rerun same activity with same input and get new output
End Loop
Continue with next activity
thanks,
Richard
--
Richard Holland, BSc MBCS
Finance Director, Eagle Genomics Ltd
T: +44 (0)1223 654481 ext 3 | E: [email protected]
http://www.eaglegenomics.com/
------------------------------------------------------------------------------
This SF.net email is sponsored by:
High Quality Requirements in a Collaborative Environment.
Download a free trial of Rational Requirements Composer Now!
http://p.sf.net/sfu/www-ibm-com
_______________________________________________
taverna-hackers mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/taverna-hackers
Developers Guide: http://www.mygrid.org.uk/usermanual1.7/dev_guide.html
FAQ: http://www.mygrid.org.uk/wiki/Mygrid/TavernaFaq