Hello All,
My v2.00 Scheduler's programming behaves oddly and the odd
behaviour was not confirmed by others. Further work on my scheduler
reveals that it will not actuate since the very first time I used it. I am
assuming that it has become corrupted in some way and I would like to
correct the problem, BUT ....:
1. Reinstalling The Bat.exe over my installation corrects nothing.
2. Trying an older version (v1.63b11)and calling Tools/Scheduler produces
the same window and settings that I made with v2.00. I therefore assume that
these details are not in the The Bat!xxx.exe file but are in some other
file.
a) Can anyone tell me what the file is called?
b) Can anyone suggest how else to correct my scheduler without losing
everything else in the process?
Another oddity I noticed during my investigations was that although using
v1.63b11 and Tools/Scheduler produced my programmed v2.00 scheduler window,
when I accessed scheduler via Tools/SmartBat/(Scheduler tab) I got an
entirely different Window with no programming and an older calendar!
--
Best regards,
Roger
Using The Bat! v2.00.6
________________________________________________________
http://www.silverstones.com/thebat/TBUDLInfo.html