Brian Murray [2014-05-14  7:32 -0700]:
> I don't think iscsitarget should have been moved away from provisional
> since we had only a month's worth of data and it was not included in the
> provisional status report.

Indeed, that wasn't intended. Thanks for pointing out!

> Additionally, it would be useful if when packages were added to the
> provisional section we also added a date for reviewing their
> provisional status using the same tool.

Sounds good. Both done in

https://wiki.ubuntu.com/StableReleaseUpdates/MicroReleaseExceptions?action=diff&rev2=49&rev1=48

Martin

-- 
Martin Pitt                        | http://www.piware.de
Ubuntu Developer (www.ubuntu.com)  | Debian Developer  (www.debian.org)

Attachment: signature.asc
Description: Digital signature

-- 
technical-board mailing list
[email protected]
https://lists.ubuntu.com/mailman/listinfo/technical-board

Reply via email to