HQ Position -- My understanding is that the very competent and experienced NSS 
HQ Commission has whittled their list to 6 potential sites in 2 states (plus a 
do-nothing option) for discussion at the April BOG meeting in Albuquerque. They 
will make their site recommendation at the Convention in Glenwood Springs. I 
have so far followed the NSS HQ process from a distance, as none of the 
locations suggested include far west Texas, where it might best serve me and 
the other 3 NSS members here.  However, that has to be the outcome of the HQ 
project – how will any of the sites best serve our membership in the era of 
virtual books, instant social media and recurring ecological nightmares.

I work on capital projects professionally (state park type) and did contact the 
HQ Commission chair, John Scheltens, several months ago concerning a key 
construction assumption being used in the NSS study.  I recently worked on a 
preliminary feasibility study for a 6500 ft2 (7800 ft2 gross) visitor center on 
the Franklin Mountains State Park.  Our consultant, Museumscapes of Dallas, 
estimated that the building only (excluding fees, site work, exhibits) would be 
in the range of $275 to 325 per ft2.  This is significantly higher than the 
$135 per ft2 assumed in the NSS new construction study and I questioned John 
about this.  He explained that this figure was derived from local 
engineering/construction sources. In the areas in which the HQ is proposed, 
these are all relatively low construction cost.  He suggested that I might find 
similar cost estimates here for El Paso.  I do note that some of the sites 
under evaluation by the NSS contain existing buildings which might be purchased 
and remodeled to meet NSS HQ needs. The costs there should be less than new 
construction but the end result will still be an older building with some 
upgrades.

Anyway, capital projects are always a concern due to some likelihood of 
significant cost overruns.  That applies to any of the sites under 
consideration.  They will require super project management personnel to ride 
herd on architects, contractors and their sub-contractors to make the building 
happen.

And my preference on a site for an NSS HQ --  Let the HQ Commission complete 
their mission, listen to the NSS membership and identify the option (do-nothing 
is on the table) which would offer the best service to present (and encourages 
future) NSS members . Then, I can become an advocate.

John Moses, NSS 7009 CM
El Paso
2011 BOG candidate

ps See some of you in Brackettville at the Spring TSA


____________________________________________________________
Groupon&#8482 Official Site
1 ridiculously huge coupon a day. Get 50-90% off your city's best!
http://thirdpartyoffers.juno.com/TGL3131/4d8cdb515447546d744st01vuc

---------------------------------------------------------------------
Visit our website: http://texascavers.com
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to