PERFECT DETAILS OF THE PROJECT
Rishikesh-Karnaprayag Rail – Information & Updates
Rishikesh – Karnaprayag Railway Line project is a 125.20 km single-track
railway line under construction in Uttarakhand with 12 stations by Rail
Vikas Nigam Limited (RVNL) and multiple contractors such as L&T, HCC, NEC,
Megha etc.
The project is estimated to cost Rs. 16,200 crore, create 2000+ jobs,
and will reduce the travel time between Rishikesh and Karnaprayag from 7
hours to just over 2 hours.
Length: 125.20 km
Project Completion Deadline: December 2024
Estimated Total Cost: Rs. 16,200 crore
Owner: Rail Vikas Nigam Ltd. (RVNL)
The project is considered to be of national strategic importance and is
being tracked on the Central Government’s PRAGATI (Pro Active Governance
and Timely Implementation) portal. When ready, it will help improve
connectivity to the Char Dham shrines of Yamunotri, Gangotri, Badrinath and
Kedarnath in the Garhwal region of the Himalayas.
Along its route, 105.47 km (84.24%) of it will consist of 35 bridges
and 17 tunnels including a 15.1 km tunnel, one of the longest in the
country, between Devprayag and Lachmoli.
Larsen & Toubro will deploy 2 Herrenknecht Hard Rock TBMs with
diameters of 9.1 meters on Package 4 – see details.
Project Overview
Rishikesh-Karnaprayag Route
Length: 125.20 km
Type: At-grade with tunnels & bridges
Gauge: Broad Gauge
Number of Tunnels: 17
Number of Bridges: 35
Number of Stations: 12
Station Names: Rishikesh, Muni Ki Reti, Shivpuri, Manjilgaon, Sakni,
Devprayag, Kirtinagar, Srinagar, Dhari, Rudraprayag, Gholtir, Ghauchar, and
Karanprayag
Rishikesh-Karnaprayag Map
Source: RVNL
Fares (Ticket Prices)
Fare structure, prices and rules have not been announced yet.
Tenders
Latest tender notices can be viewed on RVNL’s website here. News on these
notices, their bidders, awarded tenders and contracts can be found here.
Rishikesh-Karnaprayag Tunnel Packages and Contractors
This table is best viewed on a Desktop device.
Contract & Scope Design Consultant Civil Contractor
Tunnel Package-1 (6+015 to 18+444): Embankment between 6+015 to 6+800
(Dhalwala), Tunnel No 01 (10850 m), Embankment Shivpuri station Part Yard
Ch 17+650 to 18+444 & Box culverts – 4nos Lombardi Engineering Ltd
– Italferr S.P.A Jv Max-HES JV
Tunnel Package-2 (18+601 to 33+097): Tunnel No 02 (6460m), Bridge No 03
(Guller ) Embankment at Guller (600m), Tunnel No 03 (6720m), Minor Bridge 2
nos, and Emb. Byasi station Part Yard (450m) Yuksel Proje A.S. -ICT Larsen
& Toubro (L&T)
Tunnel Package-3 (33+097 to 47+360): Tunnel no 05 (9760m) Bridge No 6
(Ganga Nala) Geodata – Louis Berger Group JV Navayuga Engineering Company
(NEC)
Tunnel Package-4 (47+360 to 63+117): Embankment Devprayag station part yard
(240m), Minor Bridge-1 Tunnel No 08 (15100m), Embankment at Janasu
(300m) TUMAS India Pvt. Ltd M/s ALTINOK Musavirlik Muhendislik
A.S. (JV) Larsen & Toubro (L&T)
Tunnel Package-5 (63+414 to 73+001): Tunnel No. 11 (9000m), Bridge No. 10
(Dhaari In), Embankment Dhaari Station Yard (750m), Minor Bridge1 No.,
Bridge No. 11 (Dhaari Out) N/A Navayuga Engineering Company (NEC)
Tunnel Package-6 (73+489 to 83+899): Bg Tunnel No. 11 (9050m)
AECOM SongDa-Rithwik JV
Tunnel Package-7A (83+899 to 91+288): Tunnel No. 12 (7080m), Bridge No. 12
(Narkota) AECOM MAX – HES JV
Tunnel Package-7B (83+899 to 101+339): Tunnel No. 13 (9420m), Tilani
Station Part Yard (700m) and Minor Bridge-1 No AECOM Megha
Engineering & Infrastructures Limited (MEIL)
Tunnel Package-8 (101+339 to 116+911): Bridge No. 13 (Tilani Out), Bridge
No. 14 (Gholtir In), Tunnel No. 14 (6460m), Embankment Gholtir Station Yard
(550m), Minor Bridge1 No., Tunnel No. 15 (7160m), 9Emb. Gaucher Station
Yard (1100m), Minor Bridge-2 Nos Lombardi Engineering Ltd -Italferr
S.P.A Jv Megha Engineering & Infrastructures Limited (MEIL)
Tunnel Package-9 (117+365 to 125+200): Bridge No. 16 (Sivai Nala), Tunnel
No. 16 (6400m), Embankment Sivai Station Yard (950m), Tunnel 16A
(480m) TUMAS India Pvt. Ltd M/s ALTINOK Musavirlik Muhendislik A.S.
(JV) Hindustan Construction Company – Dilip Buildcon Ltd. (HCC – DBL) JV
KR IRS 131222
On Mon, 12 Dec 2022 at 20:48, 'N Sekar' via iyer123 <
[email protected]> wrote:
> https://swarajyamag.com/infrastructure/rishikesh-to-karnaprayag-indian-railways-building-17-tunnels-and-35-bridges-to-cut-travel-time-by-half
>
>
> Sent from Yahoo Mail on Android
> <https://go.onelink.me/107872968?pid=InProduct&c=Global_Internal_YGrowth_AndroidEmailSig__AndroidUsers&af_wl=ym&af_sub1=Internal&af_sub2=Global_YGrowth&af_sub3=EmailSignature>
>
> --
> You received this message because you are subscribed to the Google Groups
> "iyer123" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to [email protected].
> To view this discussion on the web visit
> https://groups.google.com/d/msgid/iyer123/1928306290.1877716.1670858289789%40mail.yahoo.com
> <https://groups.google.com/d/msgid/iyer123/1928306290.1877716.1670858289789%40mail.yahoo.com?utm_medium=email&utm_source=footer>
> .
>
--
You received this message because you are subscribed to the Google Groups
"Thatha_Patty" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To view this discussion on the web visit
https://groups.google.com/d/msgid/thatha_patty/CAL5XZooxJZ3CfbMUR%3DMNraEO5QY-4q2ayLWGnrzTjzxj8hCT7g%40mail.gmail.com.