On 07/09/10 10:38, Bruce wrote: > Has anyone noticed that cave lengths and depths reported by the textual > (survey-list and cave-list) exports sometimes differ from the length and > depth reported by the map (pdf) export, even when all these outputs are > produced with the same thconfig run? >
Yes, in the therion compiler window, I am getting length: 4156.16m (surface 0.00m, duplicated 477.89m) but the pdf is reporting 3744m For a minute I thought that I had been missunderstanding the duplicates but a quick check with one of my other surveys length: 212.77m (surface 0.00m, duplicated 433.72m) shows that duplicates have already been excluded, plus the numbers do not quite add up Andrew
