It looks like a bug. I will check it. Thanks a lot. I am afraid, it is not possible to set date format right now, but I hope, it will not be much work to add it.
Thanks, S. On 12 May 2012 12:34, Bruce <bruce at tomo.co.nz> wrote: > I have been trying to use the context option using the example from the > therion book (and a variation on it).**** > > ** ** > > point label -text â05 May 2012â -context point air-draught -scale xs**** > > ** ** > > point date -value 2012.05.05 -context point air-draught -scale xs**** > > ** ** > > Both these statements result in an error like this.**** > > ** ** > > error -- IG-InceptionPlan.th2 [383] -- object context not allowed -- point > air-draught**** > > ** ** > > I presume this is a bug? Or is it not implemented like this?**** > > ** ** > > Also, with point date, can we control the format of the output, or are we > limited to dd mm yyyy? (or perhaps it is looking at my system settings?)** > ** > > ** ** > > Bruce**** > > _______________________________________________ > Therion mailing list > Therion at speleo.sk > http://mailman.speleo.sk/mailman/listinfo/therion > > -------------- next part -------------- An HTML attachment was scrubbed... URL: <http://mailman.speleo.sk/pipermail/therion/attachments/20120512/515698a9/attachment.html>