Just a little followup form a user; I love the concept of SequencedActionsPlugin but in practice use I've found it too iffy with all the additional manual work it requires to write or copy-paste the names of actions as tags etc etc.
For it to be practical, I say it would have to be integrated more - and I really hope it can be because I believe the concept of it can be very time saving. (Following core GTD in combo with mGTD otherwise means not updating 'future actions' into 'next actions' more than once a week otherwise. What projects can actually progress at such a slow speed?) Something like SequencedActionsPlugin would really allow us to do this admin work where it belongs, i.e during the weekly review. IMO ;-) Some thoughts on integrating it; * A checkbox-type-dropdown menu next to each action, listing all other actions that same project. I guess the dropdown-menu could be present both in an actual action tiddler, but also in e.g project tiddlers next to each listed action. There are typically not that many, and I think 99% of the need should be covered if there is such a menu for only Next, Future and Waiting actions... or even 90% if it was only on the Future actions even... ...but, more importantly, some way in 'quick add'. Actually - actions inserted there *are* typically already more or less in order, so maybe pressing "create now" could by default append the previously listed action as a tag to the following one. Or a 'middle step' before pressing "create now" - i.e a button saying "action sequencing" or such to do this and resulting only in changes in the "quick add" text field, i.e nothing was yet actually created. Another thought would perhaps be to simply have each row in "quick add" numbered(!) - either manually as items are added there or simply haveing a permanent numbering of each row (e.g permanent numbers showing outside the text-field) for each row. Thus, inserting a row number as a tag, actually represents the whole action (name) at that position. ...or, an "invisible prefix" to the names. I.e as it is not, actions are presented in alphabetical order. It is of course already possible to e.g number items so that they are presented in desired order, but it is not very elegant for many reasons. Ann invidible prefix would be more elegant, and of course in combo with the system automatically resetting an action from "future" to "next" as soon as the previous next was done. ...and for mGTD 8.5 I suggest... ;-) Drag-n-drop feature, i.e in project view one can smoothly just rearrange listed actions. Same inside the "quick add" tool. Thanks /Mat --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "GTD TiddlyWiki" group. To post to this group, send email to gtd-tiddlyw...@googlegroups.com To unsubscribe from this group, send email to gtd-tiddlywiki+unsubscr...@googlegroups.com For more options, visit this group at http://groups.google.com/group/GTD-TiddlyWiki?hl=en -~----------~----~----~----~------~----~------~--~---