Hi TW5 gurus (this expression was used in a previous thread),

I use TW5 as project management and GTD tool.

Part of the GTD philosophy are regular project reviews. I store the review 
date in a tiddler field, using the TW5 date format. It would save me a lot 
of work if I could have a button that changes the date value stored in the 
‘review’ field to the current date.

Is that possible?

Thanks a lot for your help!
Michael

-- 
You received this message because you are subscribed to the Google Groups 
"TiddlyWiki" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/tiddlywiki.
For more options, visit https://groups.google.com/d/optout.

Reply via email to