Hi Bob,
I'm seeing 4.22E-12 as the slope value in the upper right of the TimeLab
phase difference plot. Is that telling me that my DUT is within +4.22ps
/ sec from my reference 1PPS for the 24 hour measurement duration?
I have attached a screen capture that will hopefully make its way
through for viewing.
Thanks,
Chris
==================================
Chris,
Just looking at the graph reminds me of a daily variation - perhaps due to
temperature. Is that likely? Would a two-day graph be worth doing in this
particular case?
Cheers,
David
--
SatSignal Software - Quality software for you
Web: http://www.satsignal.eu
Email: [email protected]
Twitter: @gm8arv
_______________________________________________
time-nuts mailing list -- [email protected]
To unsubscribe, go to
http://lists.febo.com/mailman/listinfo/time-nuts_lists.febo.com
and follow the instructions there.