Also, please keep in mind that the goals estimates for the milestones are not based on scoping out the required work for achieving the milestone. The first two are roughly part of the GSOC project, which is what their timeline goals are based on. The other will need a thorough requirement breakdown, scope, and triage to be able to assign informed timelines to them.

Thanks,
Jeff
El 6/18/14 2:23 p.m., Jeff Beatty escribió:
Hi everyone,

I've been doing a lot of thinking on what the milestones for the Intellego platform should be. I will continue to do so before our meeting tomorrow, refining and adding more details as time goes on, but I wanted to give everyone some time to look at what I've written down and come up with questions and ideas for making this better defined.

I utilized the tech spec etherpad to add this info to: https://intellego.etherpad.mozilla.org/tech-spec-process-model

Thanks,
Jeff

--
*Jeff Beatty*
Localization Engineer
@mozilla_l10n <http://twitter.com/mozilla_l10n>
801.367.3763
_______________________________________________
tools-l10n mailing list
[email protected]
https://lists.mozilla.org/listinfo/tools-l10n