I have a script that runs and at the start of the script I Import an Oracle model and use a Perform update to insert a triple containing the startdatetime of the script. I now need to insert a triple into oracle at the end of the script that contains the enddatetime. If I just add another Perform Update module near the end of the script, the triple never gets created for some reason. I tried reimporting the oracle model right before I perform the enddatetime update, but I get a SQL error that states there is a closed connection. I assume my problem has something to do with how Topbraid handles SQL transactions.
-- You received this message because you are subscribed to the Google Group "TopBraid Suite Users", the topics of which include TopBraid Composer, TopBraid Live, TopBraid Ensemble, SPARQLMotion and SPIN. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/topbraid-users?hl=en
