One area that we are planning to work on for 7.0 (end of year) will be
better round-tripping between files (which then may also be on Git) and
the graphs. A goal of this is support for running EDG locally just like
TBC-ME runs today, having users point at a workspace folder and then
seamlessly switch between TDBs and files, maybe with a "Save" button
that makes it easier to export the TDB, and a "Reload" button that would
pull the latest version from the file into the TDB. This is part of the
strategy to move more and more pure "TBC" functionality into the web
product, with the web product also executable on a local hard-drive as a
"personal" edition.
Holger
On 23/06/2020 14:19, Rob Atkinson wrote:
Probably what is require is a means to interact directly with GIT from
EDG, mirroring the equivalent capability in TBC via the ECLIPSE/GIT
integration. Custom code to write to EDG Asset collections can be
written - provided the change detection logic is good enough - but it
still doesnt make the content reusable in another context.
On Monday, 22 June 2020 15:58:29 UTC+10, Simon Opper wrote:
Hi All
This picks up the previous thread on loading graphs in EDG via a
data driven approach and especially the intent of using proxies
for source graphs to segregate production data and models.
We are now looking how this deals with CRUD of "development
instances" - Abox or other graph "edits" Tbox that are made in the
proxied EDG asset but need to be written back to the source graphs
or to staging/review graphs.
So we now have EDG consuming a source graph A as a proxy into an
EDG graph B.
What we need to do now is write any new resources created in the
EDG asset B back to:
1. to the source A : and/or
2 to a staging graph C
3. to/via a teamwork workflow D to review the changes back to C or A
Sure I can export the data from the EDG gui, or extract it via
TBCME but I want a data driven approach.
I'm hoping for a way to trigger this write back process on an
event in the EDG asset GUI of B
e.g. this could be:
1. at a minium before the EDG asset B is deleted or cleared
2. before an external proces forces the asset B to be deteled or
cleared - we can trigger the purging of assets and reloading via
a set of rules.... so can this trigger the write back before they
are nuked
3. happy case - use a shacl rule that can be clicked or run via
GUi when some action or change triggers it
4. future case - when the seletion focus of some carefully
selected page UI object(s) changes
Is there a logical starting point to acheive the above ?
Many thanks in advance
Simon
--
You received this message because you are subscribed to the Google
Groups "TopBraid Suite Users" group.
To unsubscribe from this group and stop receiving emails from it, send
an email to [email protected]
<mailto:[email protected]>.
To view this discussion on the web visit
https://groups.google.com/d/msgid/topbraid-users/4cbb3846-67e4-46fd-a83b-dd356dcbf98co%40googlegroups.com
<https://groups.google.com/d/msgid/topbraid-users/4cbb3846-67e4-46fd-a83b-dd356dcbf98co%40googlegroups.com?utm_medium=email&utm_source=footer>.
--
You received this message because you are subscribed to the Google Groups "TopBraid
Suite Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To view this discussion on the web visit
https://groups.google.com/d/msgid/topbraid-users/2f1e5fb5-8e8b-69e4-7b69-6efa85322c43%40topquadrant.com.