FWIW, we're only a dev/design/test group of 4, but we miss this too.
I thought Bugzilla's status set was perfect:
- new
- assigned
- fixed
- verified
- closed

and for testing bug fixes you really need the last 2.

I'm going to be watching for this patch, but thought I would share our
current workaround.  We added a custom field for Verification and have
several statuses there.  So we can tell if the fix was verified in
testing or in production.  It is a pain because when a bug is reopened
you need to remember to reset the verification, but that isn't nearly
as bad as never testing a fix.


--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups "Trac 
Users" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to [EMAIL PROTECTED]
For more options, visit this group at 
http://groups.google.com/group/trac-users?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to