On Jul 7, 1:13 pm, [EMAIL PROTECTED] wrote:
> On Jul 1, 2:45 am, "Lieven Cardoen" <[EMAIL PROTECTED]>
> wrote:
>
> > Hi,
>
> > I've just installed Eclipse 3.4, Mylyn 3.0 and the Trac Connector.
>
> > Everything works fine except that in the previous version (Eclipse
> > 3.3.2, Mylyn 2.0, Trac Connector) there were three fields Time spent,
> > Time remaining and Time planned. Now with my new install they are
> > gone...
>
> > Is there a way to add these...
>
> > Previous install:
>
> > New install:
>
> > Thx, Lieven Cardoen
>
> Just out of curiosity, does the Trac Project you are pointing mylyn to
> have the MasterTickets plugin installed and enabled?  my "assumption"
> based on what I am reading is that you are pointing to the same
> prjoect, and therefore you should see it.  What I was reading was that
> Mylyn would enable this feature if that plugin was installed.

I was an idiot there,not MasterTickets, TimingAndEstimation plugin.
Need some coffee, sorry.  MasterTickets is supposedly used by Mylyn
for grouping.

I am looking to install/try this out soon, so please follow up to this
group if you get a confirmation of it working, or not in the latest
version of Mylyn/trac connector.
Again, sorry for the miscommunication there.
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups "Trac 
Users" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to [EMAIL PROTECTED]
For more options, visit this group at 
http://groups.google.com/group/trac-users?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to