This is something that I think my team could really use. I need to get us upgraded to Trac 0.12 anyway, and when I do I'll try it and give you some real-world feedback.
In the meantime, a couple thoughts/questions: 1. How reliable is the 'save' at the end? We would spend a lot of time on that screen, pulling things from our Product Backlog. After all that work, it would be really bad if something went wrong when we tried to save it. 2. For managing something like Product Backlog, we would have a really long list. Your screenshots show only a few tickets, so I couldn't tell how that would display. If each doesn't scroll independently, I would think you'd tire of scrolling around so much. I used a tool called ScrumWorks that handled this very well (it just didn't have other features we needed so we went with Trac). -- You received this message because you are subscribed to the Google Groups "Trac Users" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/trac-users?hl=en.
