This is something that I think my team could really use.  I need to
get us upgraded to Trac 0.12 anyway, and when I do I'll try it and
give you some real-world feedback.

In the meantime, a couple thoughts/questions:

1. How reliable is the 'save' at the end?  We would spend a lot of
time on that screen, pulling things from our Product Backlog.  After
all that work, it would be really bad if something went wrong when we
tried to save it.

2. For managing something like Product Backlog, we would have a really
long list.  Your screenshots show only a few tickets, so I couldn't
tell how that would display.  If each doesn't scroll independently, I
would think you'd tire of scrolling around so much.  I used a tool
called ScrumWorks that handled this very well (it just didn't have
other features we needed so we went with Trac).

-- 
You received this message because you are subscribed to the Google Groups "Trac 
Users" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/trac-users?hl=en.

Reply via email to