Hello, I'm working on adding some dependency information to tickets. That is, if Ticket #1 cannot be started until Ticket #2 is completed, I would like to be able to note that Ticket #2 depends on Ticket #1, and have both tickets reflect the dependency.
I set this up with the MasterTicketsPlugin<http://trac-hacks.org/wiki/MasterTicketsPlugin>plugin, and it lets me go into a ticket and note that it depends on another ticket, e.g. to edit Ticket #2 and put "1" in its "Blocking" field. However, the other ticket isn't updated to reflect the ticket that depends on it, e.g. if I look at Ticket #1 it will not say in its "Blocked By" field or anywhere else that it depends on Ticket #2. I'm wondering whether this is expected behavior or maybe something i have configured incorrectly in the MasterTicketsPlugin, or if there is another plugin more suitable for this sort of thing? I'm testing this on Trac 0.12.3dev-r10683 with TracMasterTickets 3.0.2. Thanks! -----Scott. -- You received this message because you are subscribed to the Google Groups "Trac Users" group. To post to this group, send email to [email protected]. To unsubscribe from this group, send email to [email protected]. For more options, visit this group at http://groups.google.com/group/trac-users?hl=en.
