Hello,

I'm working on adding some dependency information to tickets.  That is, if
Ticket #1 cannot be started until Ticket #2 is completed, I would like to
be able to note that Ticket #2 depends on Ticket #1, and have both tickets
reflect the dependency.

I set this up with the
MasterTicketsPlugin<http://trac-hacks.org/wiki/MasterTicketsPlugin>plugin,
and it lets me go into a ticket and note that it depends on another
ticket, e.g. to edit Ticket #2 and put "1" in its "Blocking" field.
However, the other ticket isn't updated to reflect the ticket that depends
on it, e.g. if I look at Ticket #1 it will not say in its "Blocked By"
field or anywhere else that it depends on Ticket #2.

I'm wondering whether this is expected behavior or maybe something i have
configured incorrectly in the MasterTicketsPlugin, or if there is another
plugin more suitable for this sort of thing?

I'm testing this on Trac 0.12.3dev-r10683 with TracMasterTickets 3.0.2.

Thanks!

-----Scott.

-- 
You received this message because you are subscribed to the Google Groups "Trac 
Users" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/trac-users?hl=en.

Reply via email to