Hi,

I'm attempting to move an existing 1.0.1 trac project (under windows, 
without svn-links ) to a 1.2 project on a Linux server, using the 
description found in:

https://trac.edgewall.org/wiki/TracMigrate

skipping the svn-part and doing the init (new), backup (old), copy and 
upgrade (new).

This all looks pokey-billy until I start the new server again (using tracd).
The project that is presented then, is empty.

Did I forget any extra steps that need to be done?
What am I doing wrong?

Thanks in advance,
Tom Uijldert.

-- 
You received this message because you are subscribed to the Google Groups "Trac 
Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/trac-users.
For more options, visit https://groups.google.com/d/optout.

Reply via email to