From: "Chuck Derrow" <[email protected]>
Subject: EMC test set-up question

Hello,

Our company sells CO based telecommunications testing equipment.  Currently we
are re-testing our central controller which lives in a service center / office
complex.  This equipment has several rack mount modems which terminate inside
our cabinet on Krone blocks.  For EMC testing we generally connect a couple of
25 pair cables to the blocks in an effort to simulate the installed
application where there are live phone line connected to the modems.  

As I get ready for re-testing due to other changes in the system, IUm seeking
opinions on this Rphone line installation simulationS .

1)      Should the attached 25 pair cable be terminated into 600 ohms or left 
open
for a true simulation.  Every phone line attached in the real application will
terminate into a line card in a switch, 600 ohms.

2)      There are also 48 RS232 ports available in the system for user 
terminals. 
Currently we connect cables until no change is seen in the radiated
measurements of the system.  Should these lines be open ended or have some
sort of termination ?

I would appreciate any opinion you may have or experience you could share.  

Regards,


Chuck Derrow
Sr. Compliance Engineer 
Teradyne, Telecommunications Div.
[email protected]


Reply via email to