Correct. Production Line Testing will apparently now be covered in the Follow-up procedures according to the Engineers we use at UL, North Carolina. This is similar to the CSA where the Design manual contains all the Production Line testing. I do not know what other NRTL's are doing about this.
Andy Brown x33910 Senior Approvals Engineer Madge Networks Limited
