Correct.

Production Line Testing will apparently now be covered in the Follow-up 
procedures according to the Engineers we use at UL, North Carolina. This 
is similar to the CSA where the Design manual contains all the Production 
Line testing. I do not know what other NRTL's are doing about this.

Andy Brown
x33910
Senior Approvals Engineer
Madge Networks Limited


Reply via email to