El 16/06/2014 15:37, "Cédric Krier" <[email protected]> va escriure: > > On 16 Jun 15:30, Guillem Barba Domingo wrote: > > > You can define many BOM's for the same product. > > > By default Tryton will pick the first one but it should be possible to > > > write a code to select one base on some criteria. > > > > > > If in the described use case, for each product there is only one valid BoM, > > maybe you found useful our module production_bom_versions [1]. > > It adds to BoM an start/end dates, and a BoM can be related to its "master > > BoM" (it's a way to "group" them, there is nothing inherited from "master > > BoM"). > > There is only one active version per each master. > > But it is missing the management of the link between product and bom.
The link is between product and master bom. > > [1] https://bitbucket.org/nantic/trytond-production_bom_versions/ > > > > -- > > Guillem Barba > > http://www.guillem.alcarrer.net > > -- > Cédric Krier - B2CK SPRL > Email/Jabber: [email protected] > Tel: +32 472 54 46 59 > Website: http://www.b2ck.com/
