So what is going to be the time periods between changes. Is going to
be changed by the day,hour, minute? cause it can change like every 2
minutes it would be hard to tell a client that they had 50 more calls
one minute and 0 the next. And what is going to be our interval of
change at minimum developers could be limited to 150 calls and maximum
350. Is it possible we could get less then 150 calls/hour?

Reply via email to