Hey all,

So it's release day and I have tagged and pushed things out.

First up, we should revisit things I mentioned in the -rc1 release. The
mailing list migration had a few more hiccups after, but we should,
hopefully, be set. That said, I do see one more issue that I've raised,
which is that I believe due to how DMARC works, some patches authors are
being rewritten not in patchwork, but in lore (patchwork has a fixup in
place). I'm keeping an eye on pull requests and will do more fixups as
needed, until we have things done. But that means good news,
lore.kernel.org has caught up with the move and the backlog and I don't
see anything missing. And, the move of our Gitlab instance to
https://git.u-boot-project.org/ has been stable. If people need access
and have not yet gotten an account, please do so soon.

So, the git tag has been pushed to
https://git.u-boot-project.org/u-boot/u-boot and the release itself is
also under https://git.u-boot-project.org/u-boot/u-boot/-/releases/

At this point, the next branch is now also open.

We're continuing with a community meeting following the release and the
calendar link is
https://calendar.google.com/calendar/event?action=TEMPLATE&tmeid=Z2IwbHR2NjZhMzZkOThqNHJoc2sxZG04MzJfMjAyNjA3MjhUMTUwMDAwWiA4OWJlN2I4MTMxMzZiZWMwNmE4M2RlNGRhNTk3NDVmMGFiZDExYzFiODM2MDYxYWUwNmMxYzdkYmNkMThkZjQxQGc&tmsrc=89be7b813136bec06a83de4da59745f0abd11c1b836061ae06c1c7dbcd18df41%40group.calendar.google.com&scp=ALL
and once again this is the same time as the previous meeting. The
meeting details itself are:
https://meet.google.com/jwj-pqka-bnj
August 11th, 2026. 9am (GMT -06:00)

To join by phone:
Or dial: (US) +1 929-277-5781 PIN: 115 674 167
More phone numbers: https://tel.meet/jwj-pqka-bnj?pin=2145803234090

In terms of a rough changelog:
- Platform updates for i.MX, TI K3, Marvell, atmel, Renesas, RISC-V,
  MediaTek, 
- Fixes in our DFU, Documentation, EFI Loader, UFS, NVMe, MMC, USB, FWU,
  watchdog, and BTRFS subsystems / drivers.
- Update to v7.1-dts tag for dts/upstream
- FIT images can authenticate a dm-verity roothash.

I continue to plan to do an rc release every two weeks and the final
release will be 05 October 2026.

Thanks all!

-- 
Tom

Attachment: signature.asc
Description: PGP signature

Reply via email to