Forwarded from the outages list as this may have more relevance for those of us on this side of the Atlantic.

Another datapoint in the "when groups of Internet techies meet up and socialise, bad stuff happens nearby" experiment :-)

Paul.


-------- Original Message --------
Subject:        Re: [outages] Level 3 cable cuts in Europe (between UK/IE)
Date:   Thu, 18 Apr 2013 22:08:58 -0400
From:   Mitch <[email protected]>
To:     Jeremy Chadwick <[email protected]>
CC:     [email protected] <[email protected]>



This is what i'm showing in the Level 3 portal. Sorry for the long amount, just wanted to give all the info

Network Event Summary: A fiber cut on an underwater cable between United Kingdom and Ireland, with a pre-existing fiber failure on the secondary cable (6497787), thereby impacting both protected and unprotected services.
Event Ticket ID:        6512154
Market Area Affected:   Whitesands, United Kingdom / Kilmore Quay, Ireland
Ticket Create Date:     4/18/13 11:01:27 AM GMT
Impacted For:   *15 hours 48 minutes*
Event Status:   Active
Resolve Date:   
Time Since Last Update:         *2 hours 49 minutes*
*There are currently no reported impacts to your services caused by this network event. If you are experiencing a service disruption, please report the issue to Level 3 by submitting a ticket via the MyLevel3 Portal or calling 877-4LEVEL3.*

Recent Notes
Date    Notes
4/18/13 11:18:52 PM GMT The EU Transport NOC advised that the Segment A fault between Whitesands, United Kingdom and Kilmore Quay, Ireland is located approximately 23 kilometers from Whitesands, United Kingdom. Preparations for fiber repairs are ongoing for the Segment B fault under Event Ticket 6497787 and the next update will be sent when new information becomes available. 4/18/13 10:51:36 PM GMT The EU Transport NOC reported that preparations for fiber repairs are ongoing at this time on the Segment B cable failure. The EU Transport NOC also advised that the cause for the fiber cuts cannot be determined at this time. Additionally, as repairs will commence on the Segment B cable failure first, the estimated repair time for the Segment B cable is Sunday, April 21st, and upon completion the cable ship will travel to the Segment A fault location to begin repairs thereafter. The estimated repair time for Segment A is Wednesday April 24, 2013, and the EU Transport NOC informed that both estimated repair times are contingent on weather conditions. As such, further updates will be provided as new information becomes available. 4/18/13 1:30:00 PM GMT The EU Transport NOC advise the cable ship commencing repairs on the Segment B fiber failure is reporting to have enough cable and supplies to also complete the Segment A repair between Whitesands, United Kingdom and Kilmore Quay, Ireland. The current estimated repair time for Segment B fiber is Sunday, April 21st. Upon completion of Segment B, the cable ship will then transit to the Segment A fiber failure and commence repairs thereafter. The EU Transport NOC report that repairs for the Segment A cable are expected to be completed four days following Segment B repairs weather permitting. As such, further updates will be provided as additional information becomes available. 4/18/13 11:32:32 AM GMT EU Transport NOC advised a suspected subsea fiber cable failure on Segment A between Whitesands, U.K . and Kilmore Quay, Ireland, isolating all network elements on Ireland. Due to a previous fiber failure on Segment B on the subsea fiber cable last week, the Segment A fiber failure has affected both protected and unprotected services as well as all telemetry to network devices. Currently, a cable repair ship is on station for the Segment B fiber failure, however, adverse weather and sea conditions have delay immediate repair to the damaged cable. Preparations are underway for a cable ship dispatch on the Segment A fiber failure.