Thomas,Other replies have covered WSRP support. As for the release time line the last big feature before RC2 that is currently being worked on is a new theme. That work should be wrapping up towards the end of this week after which I'll be cutting RC2 to start testing on for the GA release.
-Eric Thomas S. Pangborn wrote:
What is the current time-line for uPortal 3.0.0? I am currently testing with the RC2-SNAPSHOT. Also any documentation on how to setup a producer in 3.0? Would this be part of the portal or would this be configured with setup files of some sort? Thanks in advance, Thomas
smime.p7s
Description: S/MIME Cryptographic Signature
