Hi I have an urgent requirement for *‘RELEASE MANAGEMENT SUPPORT’* please
send me your resumes along with your contact details.



*Position :* RELEASE MANAGEMENT SUPPORT

*Location :* Redmond, WA

*Duration :* 6 months



*Job Requirement: *

*Phase 1 (FY15 H1) *

·         Develop a comprehensive software release process for software
deployments in the ESIT HBI PPE space

·         Create all required document, forms, or other artifacts

·         Create are contribute to a release calendar. Whether is a Ops
owned or engineering owned calendar

·         Establish partnerships with appropriate engineering PMs/project
teams to streamline the release process

·         Develop the key performance indicators that are applicable to
release management

                               What does success look like?

*Phase 2 (FY15 H2 on) *

·         Own and operate the release manage process created in Phase 1

·         Report on PKI identified in Phase 1

·         Create deployment bugs as required

·         Continue to partner with engineering teams to ensure a rapport is
maintained

·         Provide suggestions for improvement the release process







Regards,

Mahesh



[image:
http://sagedevelopment.co/test/sageitinc/wp-content/uploads/2014/04/logo1.jpg]

3011 Internet Blvd, Ste 110 Frisco, TX 75034

Phone: 9729960650 Ext-  337

Email: [email protected]

-- 
You received this message because you are subscribed to the Google Groups 
"US_IT.Groups" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/us_itgroups.
For more options, visit https://groups.google.com/d/optout.

Reply via email to