Hi All, The new date & time features of the Rev 2.8.1 betas have revealed a bug in my Calendar stacks. I'm not quite sure how they worked before as I had a line that converted a date from short english date to long system date. The supplied date was actually in date items format, so it really should never have worked, however it only stopped working in 2.8.1
Anyway, if anyone is using the stacks, there is an update. If you already have any of the calendar stacks embedded in your projects and just want to apply the fix (one line), here it is: edit the stack script of the calendar stack (any of the 3 sizes, they are all the same) find the "setupCurrentDate" handler look for these 3 lines: put today into tDate convert tDate from short English date to long system date put titleCase(tDate) into fld "Selected" replace the middle of these lines with: convert tDate from dateItems to long system date Don't forget to save the stack when you have made the change. Cheers, Sarah _______________________________________________ use-revolution mailing list [email protected] Please visit this url to subscribe, unsubscribe and manage your subscription preferences: http://lists.runrev.com/mailman/listinfo/use-revolution
