Hi Antti,
There is a section at the end of the Synchronization module document [1] that describes how to activate content on a scheduled basis. While the document not address scheduling exactly, it shows how to create a scheduled job that executes a command. See if you can apply the instructions.[1] http://documentation.magnolia-cms.com/modules/synchronization.html#Scheduledsynchronization
Thanks a lot. That seems like a possible answer to my search. I'll try to use the activation command from adminInterface module in the scheduler to test it.
The problem is that it's not exactly the functionality I was looking for. I thought there's a way to define smth. like "(de)activate at" property for a node and run some scheduled job that will (de)activate the node (with its children or not) without writing any code :)
Seems like I'll need to code smth. like a wrapper command for ActivateCommand...
Or have I missed smth.? -- Alexey Gromov Dievision GmbH | Kriegerstrasse 44 | 30161 Hannover Telefon: (0511) 288791-0 | Telefax: (0511) 288791-99 http://www.dievision.de | mailto:[email protected]
signature.asc
Description: OpenPGP digital signature
