Hi Antti,

There is a section at the end of the Synchronization module document [1] that 
describes how to activate content on a scheduled basis. While the document not 
address scheduling exactly, it shows how to create a scheduled job that 
executes a command. See if you can apply the instructions.

[1] 
http://documentation.magnolia-cms.com/modules/synchronization.html#Scheduledsynchronization

Thanks a lot. That seems like a possible answer to my search. I'll try to use the activation command from adminInterface module in the scheduler to test it.

The problem is that it's not exactly the functionality I was looking for. I thought there's a way to define smth. like "(de)activate at" property for a node and run some scheduled job that will (de)activate the node (with its children or not) without writing any code :)

Seems like I'll need to code smth. like a wrapper command for ActivateCommand...

Or have I missed smth.?

--
Alexey Gromov
Dievision GmbH | Kriegerstrasse 44 | 30161 Hannover
Telefon: (0511) 288791-0 | Telefax: (0511) 288791-99
http://www.dievision.de | mailto:[email protected]

Attachment: signature.asc
Description: OpenPGP digital signature

Reply via email to