On Mon, Nov 1, 2010 at 8:28 PM, Joe Alex <[email protected]> wrote: > > My expectation was even though Node 2 was down key written to Node 3 > or 4 should be updated in Node 2 using Hint and the subsequent reads > to Node 1 or Node 2 itself should have got the latest value
Your expectation is correct, unfortunately I broke HH in 0.6.5 with a bad backport and it affects 0.6.6: https://issues.apache.org/jira/browse/CASSANDRA-1656 But, that is why we have Read Repair and AES. It's worth noting that HH is best effort anyway, if Node 2 was down but the failure detector hadn't noticed yet, no hint would be created and you'd have the same behavior. -Brandon
