On Apr 25, 2008, at 2:50 AM, Phani Madgula wrote:

Hi,

We have an enterprise application archive that has several submodules (WAR,JAR and RAR) within it. If we provide module level geronimo deployment plans as well as a geronimo-application.xml plan for entire application, how is the order of the precedence??

Can a Geronimo user provide plan at the module scope as well as at the EAR scope?? How is the plan evaluated ??

There are 3 places a [partial] plan can be for an ear, and they are used in this order:

1. external plan
2. ear level geronimo-application.xml
3. module level geronimo|openejb-*.xml

So, anything in an external plan takes precedence over bits in (2) or (3) configuring the same module. Anything in (2) takes precedence over a module level plan. If a module level plan is missing from (1) its looked for in (2),then (3); if missing from (1) and (2), then its looked for in the module (3).

There is no attempt to merge plans from these different locations: e.g. if there's something in (1) for a module, any other plans are ignored.
thanks
david jencks



Thanks in Advance.
Phani



Reply via email to