On Apr 25, 2008, at 2:50 AM, Phani Madgula wrote:
Hi,
We have an enterprise application archive that has several
submodules (WAR,JAR and RAR) within it. If we provide module level
geronimo deployment plans as well as a geronimo-application.xml plan
for entire application, how is the order of the precedence??
Can a Geronimo user provide plan at the module scope as well as at
the EAR scope?? How is the plan evaluated ??
There are 3 places a [partial] plan can be for an ear, and they are
used in this order:
1. external plan
2. ear level geronimo-application.xml
3. module level geronimo|openejb-*.xml
So, anything in an external plan takes precedence over bits in (2) or
(3) configuring the same module. Anything in (2) takes precedence
over a module level plan. If a module level plan is missing from (1)
its looked for in (2),then (3); if missing from (1) and (2), then its
looked for in the module (3).
There is no attempt to merge plans from these different locations:
e.g. if there's something in (1) for a module, any other plans are
ignored.
thanks
david jencks
Thanks in Advance.
Phani