Hi devdoer, What version are you using?
-Sandy On Thu, Aug 8, 2013 at 4:25 AM, devdoer bird <[email protected]> wrote: > HI: > > I configure the FairScheduler with default settings and my job has 19 > reduce tasks. I found that all the reduce tasks are schedule to run in one > node. > > While with default FIFO schedule, the 19 reduce tasks are scheduled into > diffrent nodes. > > How can I configure FairSchedule to load more balance? > > > -- > devdoer > [email protected] >
