Hi, What's the best practice to calculate this value for your cluster, if there is some?
In some situations we saw that some maps are taking more than default 60 seconds which was failing specific map job (as if it failed once, it failed also every other time by number of configured retries). I would like to tune RPC parameters a bit, but googling and looking into HBase Book doesn't tell me how to calculate right values, and what else to take a look beside hbase.rpc.timeout. Thanks a lot, Dejan