On 19 December 2012 16:53, Shay Ginsbourg <[email protected]> wrote:
> 1. Are you using external plugins ? - Google plugin (Version 0.5.5) for Jmeter
>
> 2. On what kind of machine does it take 200 seconds for a 5MB file ? -
> i5 6GB RAM 64-bit Ubuntu Server MAAS Ubuntu 10.04 LTS
>
> 3. To which value is -Xmx set ? - JVM_ARGS="-Xms512m -Xmx512m"
>
> 4. Can you submit a sample Test Plan showing issue ? - Sorry, no.
>

Why not? It does not have to contain any sensitive information, just a
sample plan that exhibits the behaviour you are seeing.

>
>
>
> On Mon, Dec 17, 2012 at 2:33 PM, Philippe Mouawad
> <[email protected]> wrote:
>>
>> Hello,
>> Are you using external plugins ?
>> On what kind of machine does it take 200 seconds for a 5MB file ?
>> To which value is -Xmx set ?
>>
>> Can you submit a sample Test Plan showing issue ?
>>
>> Thanks
>> Regards
>> Philippe
>>
>> On Mon, Dec 17, 2012 at 12:38 PM, Shay Ginsbourg
>> <[email protected]>wrote:
>>
>> > Indeed, here are my findings, as follows:
>> >
>> > Opening a 1 MB JMX with Jmeter 2.8 (regardless of the HW
>> > specification) is under 5 seconds, either on a Linux or a Windows
>> > system.
>> > With 2 MB file size, the user would have to wait under 10 seconds.
>> > However, with 5 MB, the user would have to wait approximately 200
>> > seconds (over 3 minutes!) just to have Jmeter 2.8 open the JMX.
>> >
>> > Are those measurements known to all?
>> >
>> > Can the simple operation of file opening be optimized?
>> >
>> >
>> >
>> >
>> >
>> >
>> > On Mon, Dec 17, 2012 at 12:51 AM, Stott, Charlie <[email protected]>
>> > wrote:
>> > >
>> > > You have asked an entirely subjective question.
>> > >
>> > > Perhaps you could publish your own findings and start a discussion,
>> > rather
>> > > than asking us all to run experiments for you.  Clearly it is
>> > > something
>> > you
>> > > think is an issue, but it is apparently not so to others.
>> > >
>> > > Charlie
>> > >
>> > > > -----Original Message-----
>> > > > From: Shay Ginsbourg [mailto:[email protected]]
>> > > > Sent: Sunday, 16 December 2012 6:53 PM
>> > > > To: JMeter Users List
>> > > > Subject: Re: JMX file->open duration
>> > > >
>> > > > Because I suspect it to be extremely non-linear, and increase to an
>> > > > unacceptable time duration as a function of the file size.
>> > > >
>> > > >
>> > > >
>> > > >
>> > > > On Sun, Dec 16, 2012 at 10:29 AM, Shmuel Krakower
>> > > > <[email protected]>
>> > > > wrote:
>> > > > >
>> > > > > Why does it matter?
>> > > > > On Dec 16, 2012 10:16 AM, "Shay Ginsbourg" <[email protected]>
>> > > > wrote:
>> > > > >
>> > > > > > Hi,
>> > > > > > What is the expected normal time duration of JMX file open
>> > > > > > operation, where the JMX file size is 1MB, 2MB, 5MB ?
>> > > > > > Any ideas?
>> > > > > > thanks,
>> > > > > > Shay
>> > > > > >
>> > > > > >
>> > --------------------------------------------------------------------
>> > > > > > - To unsubscribe, e-mail: [email protected]
>> > > > > > For additional commands, e-mail: [email protected]
>> > > > > >
>> > > > > >
>> > > >
>> > > >
>> > > >
>> > > >
>> > > > --
>> > > >
>> > > > Regards,
>> > > >
>> > > >
>> > > > Shay Ginsbourg
>> > > >
>> > > > Regulatory & Testing Affairs Consultant
>> > > >
>> > > >
>> > > > WWW.GINSBOURG.COM
>> > > >
>> > > >
>> > > > Providing Regulatory, Medical & Performance Testing services since
>> > 2008:
>> > > >
>> > > >
>> > > > * IEC 62304 Medical Device Software Life Cycle
>> > > >
>> > > > * IEEE 829 Software Test Documentation
>> > > >
>> > > > * ISO 14971 Medical Device Risk Management
>> > > >
>> > > > * FDA 21 CFR Part 11 Software Validation
>> > > >
>> > > > * IEC 60601-1:2005 3rd ED PEMS - Medical Electrical Equipment
>> > > >
>> > > > * End-to-end verification, validation, and testing (VV&T)
>> > > >
>> > > > * FDA and CE submissions
>> > > >
>> > > > * Open source free testing tools implementation
>> > > >
>> > > > * Functionality and regression testing
>> > > >
>> > > > * Software Performance & Load testing
>> > > >
>> > > > * Software Testing Advanced Automation
>> > > >
>> > > > * Medical Software Verification & Validation
>> > > >
>> > > > * Medical Device Verification & Validation
>> > > >
>> > > > * Medical Device Regulatory Submission
>> > > >
>> > > > * Organizational Regulatory Qualification
>> > > >
>> > > >
>> > > > Formerly QA Manager of LoadRunner at Mercury Interactive
>> > > >
>> > > >
>> > > > M.Sc. cum laude in Bio-Medical Engineering
>> > > >
>> > > > M.Sc. in Mechanical Engineering
>> > > >
>> > > >
>> > > > Work:   +972(0)3-5185873
>> > > >
>> > > > Mobile:  +972(0)54-6690915
>> > > >
>> > > >
>> > > > Email: [email protected]
>> > > >
>> > > >
>> > > > Visit my personal page on LinkedIn at:
>> > > > http://www.linkedin.com/in/shayginsbourg
>> > > >
>> > > >
>> > > > Please consider your environmental responsibility before printing
>> > > > this
>> > > > e-mail.
>> > > >
>> > > >
>> > > > ---------------------------------------------------------------------
>> > > > To unsubscribe, e-mail: [email protected]
>> > > > For additional commands, e-mail: [email protected]
>> > >
>> > >
>> > > ---------------------------------------------------------------------
>> > > To unsubscribe, e-mail: [email protected]
>> > > For additional commands, e-mail: [email protected]
>> >
>> >
>> >
>> >
>> > --
>> >
>> > Regards,
>> >
>> >
>> > Shay Ginsbourg
>> >
>> > Regulatory & Testing Affairs Consultant
>> >
>> >
>> > WWW.GINSBOURG.COM
>> >
>> >
>> > Providing Regulatory, Medical & Performance Testing services since 2008:
>> >
>> >
>> > * IEC 62304 Medical Device Software Life Cycle
>> >
>> > * IEEE 829 Software Test Documentation
>> >
>> > * ISO 14971 Medical Device Risk Management
>> >
>> > * FDA 21 CFR Part 11 Software Validation
>> >
>> > * IEC 60601-1:2005 3rd ED PEMS - Medical Electrical Equipment
>> >
>> > * End-to-end verification, validation, and testing (VV&T)
>> >
>> > * FDA and CE submissions
>> >
>> > * Open source free testing tools implementation
>> >
>> > * Functionality and regression testing
>> >
>> > * Software Performance & Load testing
>> >
>> > * Software Testing Advanced Automation
>> >
>> > * Medical Software Verification & Validation
>> >
>> > * Medical Device Verification & Validation
>> >
>> > * Medical Device Regulatory Submission
>> >
>> > * Organizational Regulatory Qualification
>> >
>> >
>> > Formerly QA Manager of LoadRunner at Mercury Interactive
>> >
>> >
>> > M.Sc. cum laude in Bio-Medical Engineering
>> >
>> > M.Sc. in Mechanical Engineering
>> >
>> >
>> > Work:   +972(0)3-5185873
>> >
>> > Mobile:  +972(0)54-6690915
>> >
>> >
>> > Email: [email protected]
>> >
>> >
>> > Visit my personal page on LinkedIn at:
>> > http://www.linkedin.com/in/shayginsbourg
>> >
>> >
>> > Please consider your environmental responsibility before printing this
>> > e-mail.
>> >
>> > ---------------------------------------------------------------------
>> > To unsubscribe, e-mail: [email protected]
>> > For additional commands, e-mail: [email protected]
>> >
>> >
>>
>>
>> --
>> Cordialement.
>> Philippe Mouawad.
>
>
>
>
> --
>
> Regards,
>
>
> Shay Ginsbourg
>
> Regulatory & Testing Affairs Consultant
>
>
> WWW.GINSBOURG.COM
>
>
> Providing Regulatory, Medical & Performance Testing services since 2008:
>
>
> * IEC 62304 Medical Device Software Life Cycle
>
> * IEEE 829 Software Test Documentation
>
> * ISO 14971 Medical Device Risk Management
>
> * FDA 21 CFR Part 11 Software Validation
>
> * IEC 60601-1:2005 3rd ED PEMS - Medical Electrical Equipment
>
> * End-to-end verification, validation, and testing (VV&T)
>
> * FDA and CE submissions
>
> * Open source free testing tools implementation
>
> * Functionality and regression testing
>
> * Software Performance & Load testing
>
> * Software Testing Advanced Automation
>
> * Medical Software Verification & Validation
>
> * Medical Device Verification & Validation
>
> * Medical Device Regulatory Submission
>
> * Organizational Regulatory Qualification
>
>
> Formerly QA Manager of LoadRunner at Mercury Interactive
>
>
> M.Sc. cum laude in Bio-Medical Engineering
>
> M.Sc. in Mechanical Engineering
>
>
> Work:   +972(0)3-5185873
>
> Mobile:  +972(0)54-6690915
>
>
> Email: [email protected]
>
>
> Visit my personal page on LinkedIn at:
> http://www.linkedin.com/in/shayginsbourg
>
>
> Please consider your environmental responsibility before printing this
> e-mail.
>
> ---------------------------------------------------------------------
> To unsubscribe, e-mail: [email protected]
> For additional commands, e-mail: [email protected]
>

---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]

Reply via email to