Hi Neill,

Thanks for your quick response
I had done 2 and 3
4 is not accessible now for me
what do you mean by headless mode?


On Wed, Apr 20, 2016 at 12:45 AM, Neill Lima <[email protected]> wrote:

> I would:
>
> 1- Run the test in headless mode during the Test execution
> 2- Add more memory to the JMeter process (Xmx / Xms)
> 3- Set the OS ulimit setting to Unlimited to enable more file descriptors
> 4- Setup another box to induce the load on the target server
>
> Try one step at a time, see if it helps.
>
> On Tuesday, April 19, 2016, Tenghuan He <[email protected]> wrote:
>
> > Hi everyone
> >
> > I am loading test a Thrift Javaserver using JMeter on the same machine
> > When setting the 6000 threads ramp up in 1 second, all the threads got
> > correct response data from the server, however the Jmeter process hangs
> up
> > and stuck, netstat -an shows that all the connections are in the
> > ESTABLISHED state.
> > When the threads number is 5000, all things work as expected.
> > Because I use Apache Thrift as the server, I do not have control over the
> > socket close.
> > Can anyone help me?
> >
> >
> > Thanks and Best Regards
> >
> > Tenghuan He
> >
>

Reply via email to