Hi Neill, Thanks for your quick response I had done 2 and 3 4 is not accessible now for me what do you mean by headless mode?
On Wed, Apr 20, 2016 at 12:45 AM, Neill Lima <[email protected]> wrote: > I would: > > 1- Run the test in headless mode during the Test execution > 2- Add more memory to the JMeter process (Xmx / Xms) > 3- Set the OS ulimit setting to Unlimited to enable more file descriptors > 4- Setup another box to induce the load on the target server > > Try one step at a time, see if it helps. > > On Tuesday, April 19, 2016, Tenghuan He <[email protected]> wrote: > > > Hi everyone > > > > I am loading test a Thrift Javaserver using JMeter on the same machine > > When setting the 6000 threads ramp up in 1 second, all the threads got > > correct response data from the server, however the Jmeter process hangs > up > > and stuck, netstat -an shows that all the connections are in the > > ESTABLISHED state. > > When the threads number is 5000, all things work as expected. > > Because I use Apache Thrift as the server, I do not have control over the > > socket close. > > Can anyone help me? > > > > > > Thanks and Best Regards > > > > Tenghuan He > > >
