Thanks.. There is a option to set Start Method in Connection tab in the Job settings. I made to changes to "Start when the Schedule window starts" and the problem got resolved.
Regards Anupam On Thu, Aug 2, 2012 at 10:59 PM, Karl Wright <[email protected]> wrote: > The incremental will work the same whether the job is run manually or > started automatically. > > If you have added the appropriate schedule record to your job, you > also have to select the "run job automatically" radio button on one of > the other job tabs for automatic runs to take place. I suspect that > is what you are missing. > > Karl > > On Thu, Aug 2, 2012 at 1:12 PM, Anupam Bhattacharya <[email protected]> > wrote: > > I have a Job which is indexing properly even the incremental indexing, if > > initiated/Run manually. Although even after adding a specific time to Run > > the schedular process the Jobs is not starting on its own. > > > > What is the ideal configuration to configure a Job which run > automatically > > everyday at 12 am and does and incremental re-indexing (only look for > those > > document which are new OR modified after the last crawl) of the > repository ? > > > > Is it necessary to input/give the total run time details for adding a > > specific schedule time. > > > > Regards > > Anupam >
