Thanks..

There is a option to set Start Method in Connection tab in the Job
settings. I made to changes to "Start when the Schedule window starts" and
the problem got resolved.

Regards
Anupam

On Thu, Aug 2, 2012 at 10:59 PM, Karl Wright <[email protected]> wrote:

> The incremental will work the same whether the job is run manually or
> started automatically.
>
> If you have added the appropriate schedule record to your job, you
> also have to select the "run job automatically" radio button on one of
> the other job tabs for automatic runs to take place.  I suspect that
> is what you are missing.
>
> Karl
>
> On Thu, Aug 2, 2012 at 1:12 PM, Anupam Bhattacharya <[email protected]>
> wrote:
> > I have a Job which is indexing properly even the incremental indexing, if
> > initiated/Run manually. Although even after adding a specific time to Run
> > the schedular process the Jobs is not starting on its own.
> >
> > What is the ideal configuration to configure a Job which run
> automatically
> > everyday at 12 am and does and incremental re-indexing (only look for
> those
> > document which are new OR modified after the last crawl) of the
> repository ?
> >
> > Is it necessary to input/give the total run time details for adding a
> > specific schedule time.
> >
> > Regards
> > Anupam
>

Reply via email to