Hello Everyone,
I would like to automatically assign fixed assets (machine tools on a
production line) to production runs. The way ofbiz seems to be setup
requires that someone manually assign everything that gets made through the
system.

/manufacturing/control/ProductionRunFixedAssets?productionRunId=10695

Both I and a colleague have looked through the docs and there isnt an
obvious way to do this.
Is there anyway to automatically assign fixed assets to production runs? Is
there a better way to handle this?

Many thanks for your input

-- 
Todd Burdeinei
Web Developer
Burdeinei Corp
702-259-3273 office / fax number
702-372-9920 cell
[email protected]

Reply via email to