Hello Everyone, I would like to automatically assign fixed assets (machine tools on a production line) to production runs. The way ofbiz seems to be setup requires that someone manually assign everything that gets made through the system.
/manufacturing/control/ProductionRunFixedAssets?productionRunId=10695 Both I and a colleague have looked through the docs and there isnt an obvious way to do this. Is there anyway to automatically assign fixed assets to production runs? Is there a better way to handle this? Many thanks for your input -- Todd Burdeinei Web Developer Burdeinei Corp 702-259-3273 office / fax number 702-372-9920 cell [email protected]
