I have requirement for similar kind of scenario
1. a sales order for finished product A is received 2. A is made up by C and B, that in turn is made up by D and E 3. A, B are not kept in warehouse; A is assebled from B and C; and B is assembled from D and E; 4. in order to fulfill the sales order two production (assembly) orders are created: order 1000 and 1001 5. C, D, E, F, G, H are kept in warehouse; C, D, F, G, H are purchased; E is manufactured with lot production; C, D, E, F, G, H are all under the control of MRP process. 6. if the stock level of E is low, when we run the MRP a new production order proposal for E will be generated; this proposal could become a production order (2000) can any one tell me how can i achieve this scenario ???? -- Regards, Kushal Darji
