Thanks Pierre,

Are the only tasks that should be related to production runs those that represent work performed by the same facility as the production run? The cleaning/inspection tasks is actually performed by a dept/facility external to the one that performed manufacturing. But when the cleaning/inspection task is complete, the pieces can only be stocked in at the facility associated with the production run which is the manufacturing facility where the BOMs were derived. It seems to get the finished pieces into the cleaning/inspection facility, an Inventory Transfer would have to occur. This is fine but it seems not to reflect what actually happened. In other words, cleaning/inspection was not performed in the manufacturing facility and then transferred to the cleaning/inspection dept. Instead the transfer took place after the initial inspection task was complete. Therefore it seems the pieces should technically be considered in the cleaning/inspection facility not the manufacturing facility.

I'm still not entirely sure how the inspections should be modeled. As production runs themselves or tasks that share a production run with prior manufacturing tasks.

Reply via email to