I suppose the TimeEntryAssoc entity could be extended to include
quantityRejected and responsiblePartyId fields to eliminate the need for
a separate TimeEntryRejectParty entity.
On 02/27/2014 08:53 AM, Christian Carlow wrote:
After making some progress on this issue by adding the
timesheet/timeentry functionality to the production run task
declaration services, I've encountered more difficulties implementing
the needed functionality. I added a TimeEntryAssoc entity so that
inspectors can directly inspect a manufacturing workers prior time
entry. I was going to use the TimeEntryAssoc entity to determine the
number of bad pieces per manufacturing worker by looking at the
inspection timeEntry quantityRejected and extracting the related
manufacturing time entry partyId. The problem with this is that
sometimes rejected quantity on the inspection ticket might represent
faults on the inspectors part rather than the manufacturers such as if
the inspector drops parts. For this case the inspector should be
considered the one who caused the bad piece not the manufacturer.
To determine the party at fault for rejected pieces it seems there
needs to be another entity created to track the info. Maybe something
like TimeEntryRejectParty that divides the time entry rejected
quantity and applies them to the parties actually responsible for the
rejects.
The only alternative I've come up with other than adding a new
TimeEntryRejectParty is to assign the faulty partyId to the
inventoryItemDetail record that would be created for the by-products
declared to account for the rejects. But this method is dependent on
by-products always being declared when rejects occur which might not
always happen. Therefore it seems creating a dedicated entity like
TimeEntryRejectParty is the better method.
Anyone have any thoughts on this issue?
On 02/24/2014 01:37 PM, Christian Carlow wrote:
My last post can be disregarded, splitting the production run
declaration into two different forms seems correct. There needs to
be a way to relate time entries created from the first form to
inventory item details created in the second form so that the types
of rejects that were produced from time entries can be determined.
On 02/24/2014 01:05 PM, Christian Carlow wrote:
Is there a reason the two Production Run Declaration
(manufacturing/control/ProductionRunDeclaration) forms cannot be
combined into a single form? If the first form is used to declare
rejections, why can't the by-products products be declared as
inventory in the same form instead of having to be done using the
second form?
On 02/24/2014 12:36 PM, Christian Carlow wrote:
Another related issue is how to determine the particular rejection
reasons. Inspectors may declare rejected pieces as by-products
during production run inspection steps that may be capable of
rework. The percentage good by employee report mentioned in the
previous post also displays the reasons associated with each
rejection. Each of the rejection reason codes were converted to
individual products within OFBiz, but the problem is how to relate
those rejection products declared to the inspector work effort time
entries. Adding timeEntryId to the InventoryItemDetail entity seems
to provide a way of relating time entries created by production run
task declarations. Is anyone against adding timeEntryId to
InventoryItemDetail?
On 02/24/2014 12:14 PM, Christian Carlow wrote:
I changed the title to be more clear.
The company ticket system has inspection functionality that allows
inspectors to declare multiple types of rejects for the quantity
specified on manufacturing tickets. This functionality doesn't
seem supported in OFBiz. I've see no way to determine that a
worker from a production run inspection task inspected work done
by a particular worker in the prior manufacturing step. The
company relies on this functionality to generated a percentage
good by employee report that analyzes the inspections for
rejections and looks at its related manufacturing ticket to
determine which manufacturing workers produced rejects.
I created OFBIZ-5532
<https://issues.apache.org/jira/browse/OFBIZ-5532> to allow time
entries to be created during production run task declarations. To
support the functionality explained above, I think the an
extension would be necessary for relating time entries. Something
such as TimeEntryAssoc could be created to relate the inspection
task time entry to the manufacturing task time entry so that the
actual workers and associated quantities could be determined.
On 02/24/2014 11:03 AM, Christian Carlow wrote:
Does anyone know how to track manufacturing rejects by employee?
I created a production run containing a first task that
represents manufacturing work and a second that represents the
inspection work. I need to be able to determine how many bad
pieces were caused by the employee associated with the first
manufacturing task based on rejection declarations by the
employee associated with the second task. The only way I can
think of supporting this is to have some relationship between the
time entries that relate to the production run tasks.