Dear Guru, I've created a JIRA note Ofbiz-10388 for the captioned issue. Here below is the info:
I have done the following: 1. I created a finished goods (with BOM) with 3 raw materials. 2. Routings tasks & routings and product linkage are all done correctly; 3. When the requirement method id of the product is set to "When QOH reaches minimum stock for Product-Facility" and minimum stock of the product facility is maintained with a certain figure, after MRP is run, I have got the expected Production Run. Here below is where I don't understand: 4. After successfully creating a sales order with the product requirement (30 pcs), I can see the total ATP becomes negative figure (e.g. -30) because I don't have enough stock to cover the needed quantity required by the created sales order. 5. Then I go to Manufacturing to check MRP running result, it shows me only the proposed manufacturing order receipt with 5 pcs (as set in the minimum stock) as shown in the attached png file. 6. My question is, where is the expected 30 pcs with the expected production run? P.S.: I have also tried every single sort of requirement method id in the Catalog-Product-Inventory but it simply did not work as expected. Pls help! Thanks Best Regards Schumann Ye KTK Group Co., Ltd. Mobile:+86-1800-150-1800 Email: [email protected]<mailto:[email protected]> ****************************************************** Add: Industrial Park,Yaoguan Town,Wujin District, Changzhou City, JiangSu Province,China Zip Code: 213102 Website: http://www.ktk.com.cn<http://www.ktk.com.cn/> http://www.wjjh.com<http://www.wjjh.com/>
