Thanks Dexin! I tried that but that did not work for me. I am using
Pig 0.7, what version of Pig do you use?
Yeah I think I could move it aside, but the problem is that I need to
keep track of the results, and if I move them aside then I would have
to rename the results of each job sequentially because my jobs can
repeat many times, but their results are different.
Thanks again.

Renato M.

2011/5/20 Dexin Wang <[email protected]>:
> Yeah I do that all the time.
>
> STORE result INTO 'out-$date';
>
> Or you could run the pig script then after it's done move the result aside.
>
>
> On May 20, 2011, at 6:51 PM, Renato Marroquín 
> Mogrovejo<[email protected]> wrote:
>
>> Hi, I have a sequence of jobs which are run daily and usually the logs
>> and results are erased every time they have to be re-run. Now we want
>> to keep those logs and results, but if the results already exist, the
>> pig job fails. I thought that maybe setting the results' name + date
>> would solve it for me. Can I do that from pig? Do you guys have any
>> other suggestions?
>> Thanks in advance.
>>
>>
>> Renato M.
>

Reply via email to