Alvaro Gareppe Thu, 24 Sep 2015 12:50:36 -0700
What is the goal of the prepare method in the IScheduler interface? There is a way to receive configuration using that method ? How is that specified in the configuration files ?
Thanks -- Eng. Gareppe, Alvaro