Hi Everyone, In continuum administration schedules, is Max Job Time measured in seconds/minutes or in hours. I thought that it is in seconds, so I fixed at at 60 instead of 3600 (default value), even then it says that next build will be after 1 hour. Please explain it.
Thanks Pawan
