Hi, The tests of my application can lock. I adjusted (in Continuum) the Maximum job execution time to 300 (5 minutes) The continuum finalizes the job after 5 minutes, but the linux process (of the test) keep running. This cause a problem, because the memory of the test is not released. Can the continuum kill the linux process after the Maximum job execution time? Someone can help me? Thanks
