Hi,

The tests of my application can lock.
I adjusted (in Continuum) the Maximum job execution time to 300 (5 minutes)
The continuum finalizes the job after 5 minutes, but the linux process (of the 
test) keep running.
This cause a problem, because the memory of the test is not released.
Can the continuum kill the linux process after the Maximum job execution time?
Someone can help me?
Thanks

Reply via email to