Howdy.

I am using GE2011.11.

I am successfully using GE "load_formula" to load jobs by core count using my own 
"load_sensor" script.

All works as expected with single core jobs, however, for PE jobs, it seems as if GE does 
not abide by the "load_formula".

Does the scheduler use a different "load" formula for single core jobs verses 
parallel jobs suing the PE environment setup?

Joseph
_______________________________________________
users mailing list
[email protected]
https://gridengine.org/mailman/listinfo/users

Reply via email to