Fellow users, what would happen in the following the scenaria? assume we start at v1.
do checkout, update, save, checkin do checkout, update, save, checkin do checkout save save save checkin ? I would assume it would go do checkout, update, save checkin -- goes to v2 do checkout, update, save checkin -- goes to v3 do checkout save -- v3 has changed save -- v3 has changed save -- v3 has changed checkin go to v4. The question is really around the save of node data without checkin. In this scenario, is v3 content overwritten by each save/update? If so, can we rollback to v3 *before* the checkout and saves? (sort of like an undo checkout in a version control system?) thanx -- --------------------- Michael Harris
