Is there a configuration option in 1.0.3 that allows the scheduler to build no matter if there is no change?
INFO | jvm 1 | 2006/04/25 14:15:01 | 2006-04-25 14:15:01,125 [Thread-2] INFO BuildController - The project was not built because there are no changes. Thnx, P
