Is it 1.0.3? If so and restarting Continuum and doing a build all didn't work you can modify the project state in the database with an SQL client like squirrel.
On 2/9/07, Enrique Gaona <[EMAIL PROTECTED]> wrote:
Hi, I have a build that terminated after 17 mins due to an error, but continuum still thinks the project is still building. The elapse time is now showing over 2 hours and continues to increment even though the build only ran for 17mins. Is there a way I can reset the DB? I've tried restarting continuum to no avail. Any help is very much appreciated. Enrique
-- Adam Altemus Software Engineer, MobilVox http://www.mobilvox.com [EMAIL PROTECTED] ---- Home e-mail ---- [EMAIL PROTECTED]
