Hiis there a way to perform a scheduled build even if there are no changes in cvs? I think this feature is called "Build fresh" in continuum 1.1 Beta 1. Unfortunately I'm still using continuum 1.0.3.
Cheers, michael
Hiis there a way to perform a scheduled build even if there are no changes in cvs? I think this feature is called "Build fresh" in continuum 1.1 Beta 1. Unfortunately I'm still using continuum 1.0.3.
Cheers, michael